PROJECT BLIEDEN

The main level started with getting the old red subway tiles demoed. Installing a fresh new membrane onto the subfloor. A beautiful 24inx24in porcelain tile was installed in the foyer and office space. Also a one of a kind natural stone was installed and sealed in the entrance.

The upper level started with getting the old hardwood in the bathroom and carpet from the bedroom demoed. The bedroom was a nail down 3/4in Hickory hardwood and finished off with brand new baseboard and quarter round. The bathroom was installed with the same natural stone as the lower level entrance.